INSP - Final | 7/22/1996 | 7/22/1996 | 7/22/1996 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - FNL -OK FINAL
|
Issue PAID IN FULL permit | | | 7/16/1996 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 6/5/1996 | 6/6/1996 | 6/6/1996 | A | PART |
|
|
|
06/06/96 326 - This was reinspection. R/I ok. Gas Test FAILED.
|
INSP - Rough-in & Gas Pressure | 6/4/1996 | 6/5/1996 | 6/5/1996 | P | FAIL |
Alan Hauser
|
|
|
06/05/96 350 - R/I AND PRESSURE TEST BOTH FAILED
|
Application received | | | 6/4/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 6/4/1996 | | |
|
|
|
|