Issue PAID IN FULL permit | | | 8/7/1996 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 7/15/1996 | 7/16/1996 | 7/16/1996 | A | PASS |
Alan Hauser
|
|
|
07/16/96 350 - THIS JOB IS FINAL
|
INSP - Conference | 7/15/1996 | 7/15/1996 | 7/15/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - TALKED WITH PAT ABOUT GAS PIPING AND THEY WERE GOING TO NEED METER, GAS CO. WAS COMING BY TO LOOK AT METER.
|
INSP - Gas log/ Fireplace | 7/12/1996 | 7/15/1996 | 7/15/1996 | P | PASS |
Alan Hauser
|
|
|
07/15/96 350 - F/P OK FINAL
|
INSP - Gas pressure test | 7/12/1996 | 7/15/1996 | 7/15/1996 | P | PASS |
Alan Hauser
|
|
|
07/15/96 350 - GAS LINE TO NEW F/P OK SET NEW METER TO FEED TOTAL B.T.U.
|
Issue FEE-DUE permit | | | 7/12/1996 | | |
|
|
|
|
Application received | | | 7/12/1996 | | |
|
|
|
|