INSP - Final | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
Dave Lightfoot
|
|
|
10/09/96 337 - REINSPECTION FNL -OK FINAL sign perm occ card
|
INSP - Final | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
Dave Lightfoot
|
|
|
10/09/96 337 - REINSPECTION FNL -OK FINAL sign perm occ card
|
INSP - Final | 9/24/1996 | 9/24/1996 | 9/24/1996 | P | NR |
Dave Lightfoot
|
|
|
09/24/96 337 - THIS IS FOR LATE PM BOILER NOT READY
|
INSP - Final | 9/24/1996 | 9/24/1996 | 9/24/1996 | P | NR |
Dave Lightfoot
|
|
|
09/24/96 337 - THIS IS FOR LATE PM BOILER NOT READY
|
INSP - Gas pressure test | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | PASS |
Dave Lightfoot
|
|
|
09/19/96 337 - GP -OK GAS PIPING
|
(F) Reprint permit | | | 7/23/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/22/1996 | | |
|
|
|
|
Application received | | | 7/22/1996 | | |
|
|
|
|