INSP - Final | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | PASS |
Dave Lightfoot
|
|
|
10/07/96 337 - FNL -OK FINAL FURNACE ROOM DOOR WILL BE REMOVED BY OWNER FOR WATER HEAT COMBUSTION AIR
|
INSP - Final | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | PASS |
Dave Lightfoot
|
|
|
10/07/96 337 - FNL -OK FINAL FURNACE ROOM DOOR WILL BE REMOVED BY OWNER FOR WATER HEAT COMBUSTION AIR
|
Issue PAID IN FULL permit | | | 9/24/1996 | | |
|
|
|
|
INSP - Framing/ Rough-in | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | PART |
Dave Lightfoot
|
|
|
08/23/96 337 - 8-23-96 PM. THE LATER THE BETTER. RE-INSPECTION PARTIAL R/I OK OK FOR COVER EXCEPT MECH ROOM
|
INSP - Gas pressure test | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PASS |
Dave Lightfoot
|
|
|
08/15/96 337 - GP -OK GAS PIPING
|
INSP - Retro Fit (check note) | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PART |
Dave Lightfoot
|
|
|
08/15/96 337 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED CAULK STARTING COLLORS INSULATE IN ATTIC R6 DUCT IN ATTIC TO BE 12'' ABOVE TRUSS WA
|
Issue FEE-DUE permit | | | 8/15/1996 | | |
|
|
|
|
Application received | | | 8/15/1996 | | |
|
|
|
|