INSP - Final | 11/4/1996 | 11/5/1996 | 11/4/1996 | A | PASS |
|
|
|
11/04/96 326 - REINSPECTION Corrections made. Final ok.
|
INSP - Final | 11/4/1996 | 11/5/1996 | 11/4/1996 | A | PASS |
|
|
|
11/04/96 326 - REINSPECTION Corrections made. Final ok.
|
INSP - Final | 10/21/1996 | 10/21/1996 | 10/21/1996 | P | NR |
|
|
|
10/21/96 326 - Correction: additional protecton post req/d.
|
INSP - Final | 10/21/1996 | 10/21/1996 | 10/21/1996 | P | NR |
|
|
|
10/21/96 326 - Correction: additional protecton post req/d.
|
Issue PAID IN FULL permit | | | 9/4/1996 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 8/22/1996 | 8/22/1996 | 8/22/1996 | P | PASS |
Alan Hauser
|
|
|
08/22/96 350 - R/I OK P/T OK #32937
|
Application received | | | 8/22/1996 | | |
|
|
|
|
Issue FEE-DUE permit | | | 8/22/1996 | | |
|
|
|
|