INSP - Final | 2/28/1997 | 3/3/1997 | 3/3/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/03/97 337 - FNL -OK FINAL
|
INSP - Final | 2/28/1997 | 3/3/1997 | 3/3/1997 | A | PASS |
Dave Lightfoot
|
|
|
03/03/97 337 - FNL -OK FINAL
|
Issue PAID IN FULL permit | | | 1/13/1997 | | |
|
|
|
|
INSP - Final | 1/8/1997 | 1/9/1997 | 1/9/1997 | A | NH |
Dave Lightfoot
|
|
|
01/09/97 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Final | 1/8/1997 | 1/9/1997 | 1/9/1997 | A | NH |
Dave Lightfoot
|
|
|
01/09/97 337 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Gas pressure test | 12/18/1996 | 12/18/1996 | 12/18/1996 | P | PASS |
Dave Lightfoot
|
|
|
12/18/96 337 - GP -OK GAS PIPING
|
INSP - Rough-in & Gas Pressure | 12/11/1996 | 12/11/1996 | 12/11/1996 | P | PASS |
Jim Storey
|
|
|
12/11/96 301 - RGHN-OK ROUGH IN
|
Issue FEE-DUE permit | | | 12/11/1996 | | |
|
|
|
|
Application received | | | 12/11/1996 | | |
|
|
|
|