INSP - Final | 3/27/1997 | 3/27/1997 | 3/27/1997 | P | PASS |
|
|
|
03/27/97 326 - Final ok.
|
INSP - Final | 3/27/1997 | 3/27/1997 | 3/27/1997 | P | PASS |
|
|
|
03/27/97 326 - Final ok.
|
Receive PAYMENT IN FULL PRNT | | | 3/19/1997 | | |
|
|
|
|
INSP - Framing/ Rough-in | 2/3/1997 | 2/3/1997 | 2/3/1997 | | PASS |
Dave Lightfoot
|
|
|
/ / 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 1/31/1997 | 2/3/1997 | 2/3/1997 | A | PASS |
Dave Lightfoot
|
|
|
02/03/97 337 - BASIC 4 RGHN-OK ROUGH IN GP -OK GAS PIPING
|
Application received | | | 1/31/1997 | | |
|
|
|
|
Issue FEE-DUE permit | | | 1/31/1997 | | |
|
|
|
|