CHANGE STATUS TO (D) | | | 11/5/1998 | | |
|
|
|
|
INSP - Final | 3/17/1997 | 3/18/1997 | 3/18/1997 | A | PASS |
Alan Hauser
|
|
|
03/18/97 350 - WEST SIDE 5TH FLOOR final
|
INSP - Final | 3/17/1997 | 3/18/1997 | 3/18/1997 | A | PASS |
Alan Hauser
|
|
|
03/18/97 350 - WEST SIDE 5TH FLOOR final
|
FEE REVIEW-NOTES | | | 2/21/1997 | | FEES |
|
|
|
THIS JOB WAS GOING TO BE UNDER ONE PERMIT. CONTR. SPLIT BLDG. PERMIT IN TO TWO PERMITS. FM RECIEVED A REFUND FROM THIS PERMIT. AND PAID FOR OTHER. LH
|
INSP - Gas pressure test | 2/20/1997 | 2/20/1997 | 2/20/1997 | P | PASS |
Alan Hauser
|
|
|
02/20/97 350 - 5TH FLOOR /WEST SIDE this for a r/i not pt, r/i was ok as per plan
|
Issue PAID IN FULL permit | | | 2/5/1997 | | |
|
|
|
|
Application received | | | 2/3/1997 | | |
|
|
|
|
Issue FEE-DUE permit | | | 2/3/1997 | | |
|
|
|
|