INSP - Final | 5/28/1997 | 5/29/1997 | 5/29/1997 | A | CANC |
Dave Lightfoot
|
|
|
05/29/97 337 - inspection will be done by 407 this was a conference
|
INSP - Final | 5/28/1997 | 5/29/1997 | 5/29/1997 | A | CANC |
Dave Lightfoot
|
|
|
05/29/97 337 - inspection will be done by 407 this was a conference
|
INSP - Final | 5/21/1997 | 5/27/1997 | 5/27/1997 | A | FAIL |
Russ Owen
|
|
|
|
INSP - Final | 5/21/1997 | 5/27/1997 | 5/27/1997 | A | FAIL |
Russ Owen
|
|
|
|
Receive PAYMENT IN FULL | | | 5/20/1997 | | |
|
|
|
|
CHANGE STATUS TO (I) | | | 5/20/1997 | | |
|
|
|
|
INSP - Framing/ Rough-in | 5/6/1997 | 5/6/1997 | 5/5/1997 | P | PASS |
|
|
|
05/06/97 333 - reinspection on the r/i pressure test passed RGHN-OK ROUGH IN
|
INSP - Rough-in & Gas Pressure | 4/30/1997 | 5/1/1997 | 5/1/1997 | A | PART |
Dave Lightfoot
|
|
|
05/01/97 337 - 4 basic fixtures. furnace range vent dryer vent and gas t GP -OK GAS PIPING r/i corrections
|
Application received | | | 4/25/1997 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 4/25/1997 | | |
|
|
|
|