Receive PAYMENT IN FULL | | | 8/28/1997 | | |
|
|
|
|
INSP - Final | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
Alan Hauser
|
|
|
08/26/97 350 - final
|
INSP - Final | 8/26/1997 | 8/26/1997 | 8/26/1997 | P | PASS |
Alan Hauser
|
|
|
08/26/97 350 - final
|
INSP - Rough-in & Gas Pressure | 7/3/1997 | 7/3/1997 | 7/3/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - r/i ok, pt ok
|
INSP - Gas pressure test | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PASS |
Alan Hauser
|
|
|
07/03/97 350 - already done
|
INSP - Final | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | FAIL |
Alan Hauser
|
|
|
07/02/97 350 - look on the sheet no one there, job not ready for inspection
|
INSP - Final | 7/1/1997 | 7/2/1997 | 7/2/1997 | A | FAIL |
Alan Hauser
|
|
|
07/02/97 350 - look on the sheet no one there, job not ready for inspection
|
INSP - Framing/ Rough-in | 6/25/1997 | 6/26/1997 | 6/26/1997 | A | FAIL |
Alan Hauser
|
|
|
06/26/97 350 - REPAIR FIRE DAMAGED UNIT ON THIRD FLOOR/ REPLACED DUCTWOR no r/i, corrections posted (2 copies)
|
Issue & PRINT FEE-DUE permit | | | 6/25/1997 | | |
|
|
|
|
Application received | | | 6/25/1997 | | |
|
|
|
|