INSP - Final | 2/5/1998 | 2/5/1998 | 2/5/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Final | 2/5/1998 | 2/5/1998 | 2/5/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final
|
INSP - Final | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | CANC |
Jim Sly
|
|
|
02/04/98 316 - Gave to Alan H.
|
INSP - Final | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | CANC |
Jim Sly
|
|
|
02/04/98 316 - Gave to Alan H.
|
INSP - Final | 1/30/1998 | 1/30/1998 | 1/30/1998 | P | FAIL |
Alan Hauser
|
|
|
01/30/98 350 - key on electrical meter skip ###-#### two house no address, don't have time to play detective
|
INSP - Final | 1/30/1998 | 1/30/1998 | 1/30/1998 | P | FAIL |
Alan Hauser
|
|
|
01/30/98 350 - key on electrical meter skip ###-#### two house no address, don't have time to play detective
|
Receive PAYMENT IN FULL | | | 1/22/1998 | | |
|
|
|
|
INSP - Final | 1/14/1998 | 1/14/1998 | 1/14/1998 | P | FAIL |
Alan Hauser
|
|
|
01/14/98 350 - KEY ON ELEC METER--PROBLEM CALL SKIP AT ###-#### $42 reinspection fee, corrections not finished, corrections wh
|
INSP - Final | 1/14/1998 | 1/14/1998 | 1/14/1998 | P | FAIL |
Alan Hauser
|
|
|
01/14/98 350 - KEY ON ELEC METER--PROBLEM CALL SKIP AT ###-#### $42 reinspection fee, corrections not finished, corrections wh
|
Fee Due (change status F) | | | 1/14/1998 | | |
|
|
|
|
(F) Reprint permit | | | 1/14/1998 | | |
|
|
|
|
INSP - Final | 12/22/1997 | 12/23/1997 | 12/23/1997 | A | FAIL |
Jim Sly
|
|
|
12/22/97 316 - C/N...Prot post, fix holes..A/C..Condens, seal dryer vent
|
INSP - Final | 12/22/1997 | 12/23/1997 | 12/23/1997 | A | FAIL |
Jim Sly
|
|
|
12/22/97 316 - C/N...Prot post, fix holes..A/C..Condens, seal dryer vent
|
Receive PAYMENT IN FULL | | | 10/20/1997 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 9/4/1997 | 9/4/1997 | 9/4/1997 | A | PASS |
Tom Arcoraci
|
|
|
|
INSP - Rough-in & Gas Pressure | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | CANC |
Jim Sly
|
|
|
09/03/97 316 - Gave to tom A.
|
INSP - Final | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | CANC |
Jim Sly
|
|
|
09/03/97 316 - Gave to Tom A.
|
INSP - Final | 9/3/1997 | 9/4/1997 | 9/4/1997 | A | CANC |
Jim Sly
|
|
|
09/03/97 316 - Gave to Tom A.
|
INSP - Rough-in & Gas Pressure | 8/27/1997 | 8/28/1997 | 8/28/1997 | A | CANC |
Jim Sly
|
|
|
08/27/97 316 - Gave to Tom A.
|
Issue & PRINT FEE-DUE permit | | | 8/27/1997 | | |
|
|
|
|
Application received | | | 8/27/1997 | | |
|
|
|
|