INSP - Final | 4/27/1998 | 4/27/1998 | 4/28/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/27/98 408 -
|
INSP - Final | 4/27/1998 | 4/27/1998 | 4/28/1998 | P | PASS |
Tom Arcoraci
|
|
|
04/27/98 408 -
|
INSP - Final | 4/24/1998 | 4/24/1998 | 4/24/1998 | P | FAIL |
Tom Arcoraci
|
|
|
04/24/98 408 - greg ###-#### reinspection
|
INSP - Final | 4/24/1998 | 4/24/1998 | 4/24/1998 | P | FAIL |
Tom Arcoraci
|
|
|
04/24/98 408 - greg ###-#### reinspection
|
Receive PAYMENT IN FULL | | | 4/6/1998 | | |
|
|
|
|
INSP - Final | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | FAIL |
Tom Arcoraci
|
|
|
03/16/98 408 - DOOR OPEN--GREG ###-#### not ready not even close 42.00 reinspection fee
|
INSP - Final | 3/16/1998 | 3/16/1998 | 3/16/1998 | P | FAIL |
Tom Arcoraci
|
|
|
03/16/98 408 - DOOR OPEN--GREG ###-#### not ready not even close 42.00 reinspection fee
|
Fee Due (change status F) | | | 3/16/1998 | | |
|
|
|
as per 408 not ready for final not even close
|
Receive PAYMENT IN FULL | | | 3/4/1998 | | |
|
|
|
|
INSP - Rough-in & Gas Pressure | 2/27/1998 | 2/27/1998 | 2/27/1998 | | PART |
Alan Hauser
|
|
|
/ / 350 - r/i, pt ok, piping sizing to be verified by gas co.
|
INSP - Framing/ Rough-in | 2/25/1998 | 2/25/1998 | 2/25/1998 | P | CANC |
Jim Sly
|
|
|
02/25/98 316 - Gave to Alan H. nsp pressure test
|
INSP - Rough-in & Gas Pressure | 2/25/1998 | 2/25/1998 | 2/25/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - gas pipe undersized as per titeflex
|
INSP - Framing/ Rough-in | 2/23/1998 | 2/24/1998 | 2/24/1998 | A | FAIL |
Alan Hauser
|
|
|
02/24/98 350 - R/I AND PRESS---GREG ###-#### no r/i, no pt, corrections posted
|
Application received | | | 2/23/1998 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 2/23/1998 | | |
|
|
|
|