Override - Parcel Holds | | | 12/5/2016 | | |
|
|
|
|
DOC - Permit Finaled | | | 12/5/2016 | | DONE |
|
|
|
Had final inspection 7/27/1998
|
DOC - Permit Expired | 2/15/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Alan Hauser
|
|
|
Added by Inspector: 350 On 2/15/2001 11:57:47 AM
|
Receive PAYMENT IN FULL | | | 8/6/1998 | | |
|
|
|
|
INSP - Final | 7/24/1998 | 7/27/1998 | 7/27/1998 | A | CANC |
Dave Lightfoot
|
|
|
07/27/98 337 - ###-#### dan this is for 350
|
INSP - Final | 7/27/1998 | 7/27/1998 | 7/27/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, didn't look at this on r/i, pt by gas co.
|
INSP - Final | 7/24/1998 | 7/27/1998 | 7/27/1998 | A | CANC |
Dave Lightfoot
|
|
|
07/27/98 337 - ###-#### dan this is for 350
|
INSP - Final | 7/27/1998 | 7/27/1998 | 7/27/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - final, didn't look at this on r/i, pt by gas co.
|
INSP - Rough-in & Gas Pressure | 7/23/1998 | 7/23/1998 | 7/23/1998 | | PART |
Carl Dependahl
|
|
|
/ / 340 - gas test ok, witnessed by gas co, part. need verify ducts. c recall
|
INSP - Final | 7/17/1998 | 7/17/1998 | 7/17/1998 | P | NR |
Carl Dependahl
|
|
|
Dan Casper ###-#### NEED GAS TEST , FULL R/I INSP...POST FOR FINAL, SEAL, INSULATE, ETC...
|
INSP - Final | 7/17/1998 | 7/17/1998 | 7/17/1998 | P | NR |
Carl Dependahl
|
|
|
Dan Casper ###-#### NEED GAS TEST , FULL R/I INSP...POST FOR FINAL, SEAL, INSULATE, ETC...
|
INSP - Framing/ Rough-in | 7/17/1998 | 7/17/1998 | 7/17/1998 | P | FAIL |
Carl Dependahl
|
|
|
CALLED FOR FINAL, RETRO FIT W/ 2ND STORY ADD'N...NO ROUGH PERFORMED, PERMIT APPARENTLY PULLED 7-17...MET W/ OWNER. INSTALLER RELEASED GAS LINE PRESS TEST PRIOR TO MY ARRIVAL, TOLD TO HAVE GAS CO. VERIFY FOR OPERATION OF APPLIANCES.
|
Application received | | | 7/17/1998 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 7/17/1998 | | |
|
|
|
|