INSP - Final | 9/1/1998 | 9/2/1998 | 9/2/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/02/98 337 - double wide\ a\c connection ###-#### FNL -OK FINAL
|
INSP - Final | 9/1/1998 | 9/2/1998 | 9/2/1998 | A | PASS |
Dave Lightfoot
|
|
|
09/02/98 337 - double wide\ a\c connection ###-#### FNL -OK FINAL
|
Issue PAID IN FULL permit | | | 9/1/1998 | | |
|
|
|
|
Application received | | | 9/1/1998 | | |
|
|
|
|