Final | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PASS |
Dave Lightfoot
|
|
|
reinspection pat ###-#### passed by Perry 10/25/99
|
Final | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | FAIL |
Dixie Fellows
|
|
|
PER DIXIE Met with contractor about correction
|
Final | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | PASS |
|
|
|
PER 411 correction notice on cover fireplace has been disconnected until the landing above is repaired/non combustable.
|
Final | 10/22/1999 | 10/25/1999 | 10/25/1999 | A | FAIL |
Dixie Fellows
|
|
|
n/w heating--- ###-#### fn insp---re-insp Need 18" clearance at F/P termination to combustible in basement per manufacturer; Cut out 2 sides of stand off for air dissipation
|
Final | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | FAIL |
Dave Lightfoot
|
|
|
northwest ###-#### Vent clearance
|
Final | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | FAIL |
Dave Lightfoot
|
|
|
northwest h---###-#### fn late pm if possible???? Not ready
|
Final | 10/14/1999 | 10/15/1999 | 10/15/1999 | P | FAIL |
Russ Owen
|
|
|
PAT --###-#### FN INSP Left corrections
|
INSP - Framing/ Rough-in | 7/13/1999 | 7/13/1999 | 7/13/1999 | P | FAIL |
Russ Owen
|
|
|
07/13/99 407 - need clearance at reznor garage...NCE
|
Application received | | | 7/13/1999 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 7/13/1999 | | |
|
|
|
|