(F) Reprint permit | | | 5/15/2001 | | DONE |
|
|
|
|
Final | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 12:11:55. Contact: . C/N posted. 4/26/00 11:29:50 AM
|
Pressure Test | 10/22/1999 | 10/25/1999 | 10/25/1999 | A | PASS |
Jim Sly
|
|
|
as per dixid Gas tag #033143
|
Pressure Test | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | PASS |
Dixie Fellows
|
|
|
Gas ok
|
Pressure Test | 10/22/1999 | 10/22/1999 | 10/22/1999 | P | FAIL |
Dixie Fellows
|
|
|
Curt ###-#### Gas pipe to furnace undersized
|
Application received | | | 10/22/1999 | | |
Dixie Fellows
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/1999 | | DONE |
|
|
|
|