Pressure Test | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | PASS |
Alan Hauser
|
|
|
###-#### larry\reinspection
|
Pressure Test | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | FAIL |
Dixie Fellows
|
|
|
###-#### Gas piping needs to be factory wrapped.
|
Issue PAID IN FULL permit | | | 11/17/1999 | | DONE |
|
|
|
|