BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Tom Arcoraci
|
|
|
Pete ###-#### fire life saftey ok per joe 4/17/2001 1:28:07 PM
|
BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/17/2001 3:36:52 PM Reinsp OK for certificate of occupancy
|
Permanent Occupancy | | 4/17/2001 | 4/17/2001 | | DONE |
|
|
|
|
Permanent occupancy Cert | | | 4/17/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8634 issued 4-17-01 to the Boise Police Dept.
|
FIR-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | FAIL |
Joe Tawney
|
|
|
Pete ###-#### Final Fail C/N issued 4/5/2001 8:28:18 AM
|
BLD-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | FAIL |
Tom Arcoraci
|
|
|
pete ###-#### cn issued 4/4/2001 2:08:08 PM
|
Issue Misc Permit............ | | | 3/30/2001 | | DONE |
|
|
|
|
Permit taken to Permit Desk | | | 3/29/2001 | | PASS |
Dan Stuart
|
|
|
Approved for issuance of permit based on Resolution 13533 for Occupancy Approval Review of existing office space.
|
Plans taken to the Permit Desk | | | 3/29/2001 | | PASS |
Dan Stuart
|
|
|
To permit desk to process for a permit.
|
Inspection Record Card- Bld | | | 3/29/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2001 | | DONE |
|
|
|
TALKED TO PETE TO VERIFY PLANS ARE READY
|
Application received | | | 3/27/2001 | | |
|
|
|
|
Meeting | | | 3/27/2001 | | |
Dan Stuart
|
|
|
Met with Pete Conlon to review scope of work. Proposed existing office space recently used by Records Research as office space for new tenant Boise Police Department for Office Use. Per Applicant, plan on file for layout when space was part of Idaho State Police Training Center is the same today. Gave Mr. Conlon an MIS Application to complete.
|