Case Summary | | | 4/30/2008 | | PART |
Bob Archibald
|
|
|
|
Case Summary | | | 4/30/2008 | | DONE |
|
|
|
|
Case Summary | | | 4/30/2008 | | |
|
|
|
|
Application received | | | 12/13/2007 | | PART |
Bob Archibald
|
|
|
Sprinkler plans received from Viking for remainder of sprinkler system installation, plans forwarded to Sam Rogers.
|
Meeting | | | 11/14/2007 | | PART |
Bob Archibald
|
|
|
Site meeting with Dave Hannaman and Ed with sanctuary . Santuary is requesting use of the remaining 5000 sq. ft. of building with installation of remaining sprinkler system. Dave will prepare an exiting plan and project will reinspected at completeion all existing conditions shall apply.
|
BLD-Final | 10/31/2007 | 10/31/2007 | 10/31/2007 | P | PART |
Bob Archibald
|
|
|
Applicant completed requirements of PDS and Fire Department,mis07-00226. Temporary Use Permit valid for 180 days.
|
SUPER- Supervisor's review | 10/29/2007 | 10/29/2007 | 10/29/2007 | | PART |
Bob Archibald
|
|
|
Site review by Dave Hanneman and me this date.Occupant has provided the required fire safety requirements and Dave has approved building for temporary use. Installation of panic hardware on one exterior door at north end of room #1 and installation of a secure door at room #15 required for approval of occupancy by PDS. Contractor shall contact me upon completion.
|
Miscellaneous action | | | 10/23/2007 | | PART |
Bob Archibald
|
|
|
Received revised drawings from Design West, emailed approval to Brent @ Design West subject to specific conditions. Also provided sprinkler plans to Sam R. for review that were submitted to Ren Ross.
|
Telephone call | | | 10/16/2007 | | PART |
Bob Archibald
|
|
|
With Bill on requirements identified in Bruces email of 10/11/07.
|
Meeting | | | 10/16/2007 | | PART |
Bob Archibald
|
|
|
Site meeting with fire and principals on requirements for a temporary use permit.
|
Miscellaneous action | | | 10/12/2007 | | PART |
Bob Archibald
|
|
|
List of requirements for temporary use emailed to Bill H. by Bruce C..
|
Meeting | | | 10/9/2007 | | PART |
Bob Archibald
|
|
|
Meeting with PDS staff and fire on requirements for issuing a temporary use permit.
|
Miscellaneous action | | | 10/4/2007 | | PART |
Bob Archibald
|
|
|
Received response from Bill on proposed changes and code concerns.. Issues will be discussed with mayor/staff 10/5/07
|
Miscellaneous action | | | 10/2/2007 | | PART |
Bob Archibald
|
|
|
Email to Bill H. on related code sections that needed to be addressed on exiting and life safety requirements.
|
Miscellaneous action | | | 10/1/2007 | | PART |
Bob Archibald
|
|
|
Plans recieved from Bill H. on intended uses, exiting and allowable area increases,
|
Telephone call | | | 9/28/2007 | | PART |
Bob Archibald
|
|
|
Conference call with Bruce Chatterton, Myself and Bill Hamlin on submittal of documents for review.
|
Telephone call | | | 9/24/2007 | | PART |
Bob Archibald
|
|
|
Phone conference with Bill Hamlin, architect, Empasized the need for fire sprinklers and that City would allow contractor to begin installation and that we would plan review and field inspect for compliance during installation. ALso informed Bill that financing might be available from Housing and Comunity Development, Jim Birdshaw, and to contact him. Also emphasized that without sprinkler system City has difficulty issuing any type of Temp. Occ..
|
Miscellaneous action | | | 9/20/2007 | | PART |
Bob Archibald
|
|
|
Meeting with fire, legal and PDS on possible options.
|
Miscellaneous action | | | 9/18/2007 | | PART |
Bob Archibald
|
|
|
Proposed schedule received from architect.
|
Miscellaneous action | | | 9/12/2007 | | PART |
Bob Archibald
|
|
|
Floor plan recieved from architect, requested schedule for proposed activities prior to November 1st adn after.
|
Application received | | | 9/7/2007 | | |
|
|
|
|
Staff review | 9/6/2007 | 9/6/2007 | 9/6/2007 | | PART |
Bob Archibald
|
|
|
Site review by Gordon Goldsmith and I with Design West Architect Bill Hamlin,###-####, to determine existing conditions and intended uses of structure as a homeless shelter. Numerous code violations observed: Emergency vehicle access, egress requirements, no sprinklers/alarms, panic hardware, exit lighting, landings...
|