MIS-Aging Inspection | 1/16/2008 | 1/16/2008 | 1/16/2008 | | PASS |
Jim Sly
|
|
|
All areas of remodel are covered by other permits........the furnaces in question on this MIS permit have been checked by Alan Hauser..........and are also covered by permits for remodel.
|
DOC - Permit Finaled | 1/16/2008 | 1/16/2008 | 1/16/2008 | A | PASS |
Jim Sly
|
|
|
|
FIR-Final | 10/3/2007 | 10/3/2007 | 10/4/2007 | P | FAIL |
Troy Cobbley
|
|
|
The exit lights and emergency lights at the west end of the sanctuary are wired into the lighting circuit and can be turned off with the switch. Again this inspection is for the upper floor only.
|
MEC-Conference | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PASS |
Alan Hauser
|
|
|
two new furnaces in basement, in process of getting permit for these. other mechanical permit for custom air signed temp. occ
|
Issue Misc Permit............ | | | 9/21/2007 | | DONE |
|
|
|
|
Application received | | | 9/21/2007 | | |
|
|
|
|