BLD-Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PASS |
Bob Archibald
|
|
|
Fence installed. Letter of compliance delivered to manager.
|
DOC - Permit Finaled | | | 11/2/2009 | | DONE |
|
|
|
|
Application received | | | 9/10/2009 | | PART |
Bob Archibald
|
|
|
Application receeived to construct decorative fens at rear and side of building, DRH09-00233. Appeal period expires 9/25/09.
|
BLD-Conference | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PART |
Bob Archibald
|
|
|
Site conference with Dan on fencing requirements to enclose the rear area adjacent to the "Carriage House". Dan will speak with the owners and also seek bids to enclose this area with 6' high black decorative fencing similar to fencing at rear of main structure. A response was requested by 8/21/09. I informed dan that if owners were unable to install fencing Boise City would proceed with the fencing and bill the owners the associated cost. Sarah S. informed me that a staff level decision would be initiated and followed by a 10 day appeal period in accordance with the Historic Commisions provisions for installation of the fence.
|
Miscellaneous action | | | 7/27/2009 | | FAIL |
Bob Archibald
|
|
|
No action to abate has been performed the last date to to take action per final N&O was 07/24/09. Abatement determination will be taken before City Council.
|
Telephone call | | | 7/15/2009 | | PART |
Bob Archibald
|
|
|
Phone conference with Sharon and Terry on reciept of final N&O. There are puting the building up for sale today and will be unable to abate the existing conditions on the carriage house. A realestate listing will be sent to me.
|
Miscellaneous action | | | 7/13/2009 | | PART |
Bob Archibald
|
|
|
Final N&O sent certified mail this date.
|
BLD-Conference | 5/7/2009 | 5/7/2009 | 5/7/2009 | A | PART |
Bob Archibald
|
|
|
Phone conference with owners. They are unable to abate the structure by either demolition or engineered stabalization citing the current economic situation, other variables and possibly filing Chapter 11. Discussions with administration on method of proceeding underway. Demoltion costs 5K-40K or engineered stabilization 20K.
|
Meeting | | | 4/27/2009 | | PART |
Bob Archibald
|
|
|
Met with Dan (Davies Reed) and Dwaine (Trout Arcfhitects) contract being signed with Chris Larsen (Pacific Steel) ###-#### to repair the existing structure, Keith Jones is finalizing engineering. Dan will contact Historic once contract is signed and begin process of Historic Review. Dan will also obtain the building permit for owners and Pacific will begin work. Applications should be submitted this week.
|
Telephone call | | | 4/7/2009 | | PART |
Bob Archibald
|
|
|
Conference with Dwaine Carver (Trout Architects) ###-####. Owners have agreed to the engineered fix of structure ~$15000.00. Hold-up is with Idaho Power reguirements and contractor, electrical issues may more then double repair costs. A answer to total requirements and cost will be determined and reported by 4/13/09.
|
Miscellaneous action | | | 3/3/2009 | | PART |
Bob Archibald
|
|
|
Spoke with Dwaine and Dan they are still waiting on steel reinforcing prices hope to have #s this week.
|
Meeting | | | 2/13/2009 | | PART |
Bob Archibald
|
|
|
Meeting with Dan and discussed status Dwaine with Trout Architects has proposed a stabilization method and has been instructed to contact me on status.
|
Meeting | | | 1/26/2009 | | PART |
Bob Archibald
|
|
|
1/22 and 1/23 Meetings with both Dan and Rob Thorton on proposed engineering stabilization. Application was to be submitted 1/26/09 to be on Historic Comission Agenda. After speaking with Shara S Dan was informed to provide information on stabalization to exterior and interior by 1/30/09.
|
Meeting | | | 1/9/2009 | | PART |
Bob Archibald
|
|
|
Spoke with Dan regarding the requirement to complete the application to the Historic Commission. If not completed by the 16th Boise City will begin the application process.
|
Miscellaneous action | | | 1/7/2009 | | PART |
Bob Archibald
|
|
|
Email exchange oon current status. Requested that historic application be completed by 1/16/09.
|
BLD-Conference | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PART |
Bob Archibald
|
|
|
Conference with Dan demo bids have been received and application for historic review is pending.
|
Miscellaneous action | | | 9/26/2008 | | PART |
Bob Archibald
|
|
|
Applications,( ESC, Building & Historic), delivered to Dan, 9/22. Conferences throughout week on status and proposed actions. Demo, rebuild or remodel soon to be decided.
|
Meeting | | | 9/11/2008 | | PART |
Bob Archibald
|
|
|
Masons reviewing structure for bidding.
|
Telephone call | | | 9/3/2008 | | PART |
Bob Archibald
|
|
|
Status up date on proposed residential unit.. Financing and plans still under review and preparation.
|
Telephone call | | | 8/13/2008 | | PART |
Bob Archibald
|
|
|
Phone conference with Dan on proposed residential or commercial improvement. Recommended residential because it will be reviewed under the UEBC and have a shorter historic review. Commercial would be reviewed under current IBC and longer historic review (current code and ADA requirements will ncrease costs). Decision on upgrade pending.
|
Meeting | | | 8/7/2008 | | PART |
Bob Archibald
|
|
|
Site meeting with Dan. Engineer and contractor reviewed site today and contracts for the owner are pending.
|
Miscellaneous action | | | 7/28/2008 | | PART |
Bob Archibald
|
|
|
Receipt of proposal from engineer on stabalization or rehabilitation, owners to decide which options to pursue.
|
Telephone call | | | 7/25/2008 | | PART |
Bob Archibald
|
|
|
Phone conference with Dan R. was informed that three options were prepared by architect and engineer, owners should make decision today or first of next week.
|
Miscellaneous action | | | 7/23/2008 | | PART |
Bob Archibald
|
|
|
Received correspondence from Bruce Thomas, attorney for the Reids. Followup letter from our phone conversation on 7/17/08.
|
Miscellaneous action | | | 7/18/2008 | | PART |
Bob Archibald
|
|
|
Informed that architect and engineer reviewed structure today and will prepare proposal.
|
Telephone call | | | 7/17/2008 | | PART |
Bob Archibald
|
|
|
Spoke with Bruce Thomas, ###-####, attorney for the Reids.
Questions on area of concern, time frames and general requirements.
|
Meeting | | | 7/14/2008 | | PART |
Bob Archibald
|
|
|
Met with property manager Daniel Ronfeld, ###-####, and discussed N&O. Dan informed me that they would retain and architect to design a repair for the east wall and that owners should be in town within the week. Instructed Dan to keep me informed as to progress.
|
Miscellaneous action | | | 7/10/2008 | | PART |
Bob Archibald
|
|
|
N&O mailed certified and regular mail to parcel owner, Reid's.
|
Application received | | | 7/9/2008 | | |
|
|
|
|
Miscellaneous action | | | 7/8/2008 | | PART |
Bob Archibald
|
|
|
Search at ADA County court house and and assesors office on owner of record. Structure is located on Parcel #R1013000405 and ower of record is Terry & Sharon Reid.
|
Inspection | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PART |
Bob Archibald
|
|
|
Site inspection conducted, structure photographed.
|
Miscellaneous action | | | 6/30/2008 | | PART |
Bob Archibald
|
|
|
Complaint received from Cathy Daly @ ###-####/###-#### of dangerous building at rear of her structure addressed as 112 N. 6th and located on parcel addressed as 515 W. Idaho.
|