ESC-Final | 3/14/2012 | 3/15/2012 | 3/15/2012 | A | PASS |
Jim Sly
|
|
|
Parking lot and hard surfaces clean. All soils stabilized.....BMPs removed.
|
DOC - Permit Finaled | 3/15/2012 | 3/15/2012 | 3/15/2012 | P | PASS |
Jim Sly
|
|
|
|
ESC-Final | 3/13/2012 | 3/14/2012 | 3/14/2012 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
MIS-Aging Inspection | 3/9/2012 | 3/9/2012 | 3/13/2012 | | CANC |
Jim Sly
|
|
|
Re-sched.....
|
BLD-Final | 10/13/2011 | 10/14/2011 | 10/14/2011 | P | NR |
Jim Sly
|
|
|
NR.....Went by jobsite.....appears OK....called RP to let him know we are monitoring site and also reminded him about policy for dumping concrete washout container when reaching 1/2f full.
|
BLD-Conference | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | CANC |
Jim Sly
|
|
|
Re-sched........
|
MIS-Aging Inspection | 10/12/2011 | 10/12/2011 | 10/12/2011 | | CANC |
Jim Sly
|
|
|
Re-sched.....
|
MIS-Aging Inspection | 7/13/2011 | 7/13/2011 | 7/19/2011 | | PART |
Tom Arcoraci
|
|
|
|
ESC-Conference | 8/11/2010 | 8/11/2010 | 8/12/2010 | A | PASS |
Clint A Smith
|
|
|
Required the landscape company to remove all dirt off of the parking lot hard surface and the sidewalk. Also required that all storm drains inlets need to be protected with approved storm drain inlet inlet protection until project is completed.
|
Application received | | | 8/10/2010 | | |
|
|
|
|
Issue Misc Permit............ | | | 8/10/2010 | | DONE |
|
|
|
|