Final Permit | | | 2/17/2011 | | |
|
|
|
Permit transferred to ESC10-00845 which has also been finaled.
|
ESC-Conference | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | PART |
Clint A Smith
|
|
|
Site has had no signs of any type of erosion from occuring. Permit still need tobe aquired.
|
Override - Parcel Holds | | | 11/8/2010 | | |
|
|
|
|
ESC-Conference | 11/4/2010 | 11/5/2010 | 11/5/2010 | P | PART |
Clint A Smith
|
|
|
All measure that were asked to be installed have been installed.
|
ESC-Conference | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | FAIL |
Clint A Smith
|
|
|
Stop Work Order: Must apply for the following permits and approvals: Hillside Developement Approval Building Permit Erosion and Sediment Control Permit. All permits must be accepted by the city and issued prior to the start of project. Prior to 11/5/2010, temporary erosion and sediment control need to be istalled along the bottom of slope area to protect from the potentail of any detached sediment particals from leaving the project area. Also Both storm drain inlet must be protected with an approved product due to the forecasted weather pattern for the next couple of days this weekend. Will re-inspect on 11/5/2010 PM for complaince assistance.
|
Application received | | | 11/4/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 11/4/2010 | | |
|
|
|
|
Issue Misc Permit............ | | | 11/4/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 11/4/2010 | | |
|
|
|
|