DOC - Permit Finaled | 6/20/2011 | 6/20/2011 | 6/20/2011 | A | PASS |
Clint A Smith
|
|
|
Permit was issued and work is complete.
|
ESC-Conference | 6/3/2011 | 6/3/2011 | 6/3/2011 | A | DONE |
Clint A Smith
|
|
|
Stop work order has been placed. Informed RP that he must apply for an ESC permit and to apply with plan waiver. A Grading Drainage PErmit is also required per Brian Murphy. Allowing the contractor to fill in the area with the base rock but not to lay asphalt until the time being of aquiring a grading and drainage permit.
|
Application received | | | 6/3/2011 | | |
|
|
|
|
Issue Misc Permit............ | | | 6/3/2011 | | DONE |
|
|
|
|