Meeting | | | 1/20/2012 | | DONE |
Jason Blais
|
|
|
Dan Stuart and I, Jason Blais, met with owner Dorian Duffin. He is obtaining second opinions from another architect and another engineer. Dorian acknowledges some structural issues and water infiltration issues with the building (roof) and does want to fix them. Dorian would like to enter into an Upgrade Agreement with the City to allow him to complete repairs over a 3 year period. Dorian will determine which architect and engineer he wants to hire and communicate this to the City next week. He will also work on a draft Upgrade Agreement to submit shortly understanding the most important structural issues will be worked on first.
|
MIS-Aging Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 | | PEND |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 1/17/2012 | 1/17/2012 | 1/17/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
Miscellaneous action | | | 12/5/2011 | | DONE |
Jason Blais
|
|
|
Received structural verification letter from engineer. Letter is attached to this case.
|
Miscellaneous action | | | 11/25/2011 | | DONE |
Jason Blais
|
|
|
BRS Architects has been hired to oversee and assist in remidiating the roof structure issues. An engineer has starting evaluating the situation.
|
BLD-Conference | 10/5/2011 | 10/5/2011 | 10/5/2011 | P | FAIL |
Tom Arcoraci
|
|
|
Per Bob A. inspection for structural integrity. Call tenant 30 min prior to meet for access, Daryl ###-####. roof structure needs design professional/engineer to review and identify any need action
|
Issue Misc Permit............ | | | 10/5/2011 | | DONE |
|
|
|
|
Application received | | | 10/5/2011 | | |
|
|
|
|