Case Summary | | | 9/25/2013 | | DONE |
|
|
|
|
MIS-Aging Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 | | PASS |
Tom Arcoraci
|
|
|
permits issued
|
DOC - Permit Finaled | 3/15/2013 | 3/15/2013 | 3/15/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | PEND |
Tom Arcoraci
|
|
|
Mike Jordan and I reviewed the space with Chris. No work has been performed since issuance of SWO.
|
Override - Parcel Holds | | | 12/14/2012 | | |
|
|
|
|
Override - Parcel Holds | | | 12/14/2012 | | |
|
|
|
|
Override - Parcel Holds | | | 10/11/2012 | | |
|
|
|
|
BLD-Conference | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | FAIL |
Bob Archibald
|
|
|
Issued 5 day Notice of Violation. Work proceeding without permits and inspection. Also increasing square footage by moving into the 74 S. Cole space.
|
Override - Parcel Holds | | | 9/10/2012 | | |
|
|
|
|
Override - Parcel Holds | | | 9/10/2012 | | |
|
|
|
|
MIS-Aging Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | | PEND |
Tom Arcoraci
|
|
|
|
SUPER- Supervisor's review | 4/10/2012 | 4/10/2012 | 4/10/2012 | | FAIL |
Clint A Smith
|
|
|
STOP WORK ORDER ISSUED
1.Working with out valid issued permits.
2. Concrete, mortar and plaster washout residual on an area not contained next to the canal lateral no more than 3ft from the area of washout.
3. Mortar mixer not placed into a contained area to minimize an illicit discharge.
** Must obtain all necessary permits that pertain to the construction activies that are occuring. once all permits are issued, and all violations are corrected, the stop work will be removed.**
|
Application received | | | 4/10/2012 | | |
|
|
|
|
Issue Misc Permit............ | | | 4/10/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/10/2012 | | |
|
|
|
|
BLD-Conference | 10/11/2012 | 10/11/2012 | | P | |
Tom Arcoraci
|
|
|
Per Boise Fire Inspector - work being performed today with no permits - witnessed 2X4s being unloaded and some concrete materials.
|