MIS-Aging Inspection | 12/28/2015 | 12/28/2015 | 1/4/2016 | | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 1/4/2016 | 1/4/2016 | 1/4/2016 | P | PASS |
Phil Shearer
|
|
|
All tenats have mover out. Building vacant.
|
BLD-Conference | 7/6/2015 | 8/6/2015 | 8/6/2015 | A | DONE |
Phil Shearer
|
|
|
Check status of structure. Propert should be vacant based on attached letter. Building is vacant.
|
CHANGE STATUS TO (I) | | | 7/6/2015 | | DONE |
|
|
|
|
Case Summary | | | 6/11/2015 | | |
|
|
|
|
MIS-Aging Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | | DONE |
Bob Archibald
|
|
|
|
DOC - Permit Finaled | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Bob Archibald
|
|
|
|
MIS-Aging Inspection | 2/26/2015 | 3/12/2015 | 3/13/2015 | A | PEND |
Phil Shearer
|
|
|
Talked with Brian he said that he would have the architect finish up the floor plan so we can move forward. will check back in two weeks
|
MIS-Aging Inspection | 2/10/2015 | 2/24/2015 | 2/26/2015 | A | PEND |
Phil Shearer
|
|
|
|
MIS-Aging Inspection | 1/13/2015 | 2/9/2015 | 2/10/2015 | A | PEND |
Phil Shearer
|
|
|
Talked with Brian that he mite have a new tenit and will be sumiting floor plan for the perimt. I will check back in two weeks
|
MIS-Aging Inspection | 1/5/2015 | 1/12/2015 | 1/13/2015 | A | PEND |
Phil Shearer
|
|
|
Oner is working with an Architect to get plans.
|
MIS-Aging Inspection | 12/29/2014 | 1/5/2015 | 1/13/2015 | A | CANC |
Phil Shearer
|
|
|
|
MIS-Aging Inspection | 12/8/2014 | 1/2/2015 | 1/4/2015 | A | CANC |
Phil Shearer
|
|
|
check with troy to verify that he moved out of the building as he had stated ###-####
|
MIS-Aging Inspection | 12/16/2014 | 12/29/2014 | 12/29/2014 | A | CANC |
Phil Shearer
|
|
|
|
MIS-Aging Inspection | 12/8/2014 | 12/15/2014 | 12/16/2014 | A | PEND |
Phil Shearer
|
|
|
|
MIS-Aging Inspection | 12/1/2014 | 12/8/2014 | 12/8/2014 | P | DONE |
Phil Shearer
|
|
|
Owner of tje building is working on getting old permit finaled before tenent can get CO.
|
Plan Reviewer's activity | | | 12/4/2014 | | DONE |
Tim L. Woodard
|
|
|
Talked with Tenants. Tenants informed that the space was never previously subdivided to create separate suites. Advised them that no C of O's can be issued on any suite that was subdivided without proper permits. I informed them we could give them a little more time than the 5 day notice to try and make contact with landlord to resolve situation. After discussing situation with BO it was decided to extend the notification of compliance an additional 25 days. TLW
|
MIS-Aging Inspection | 11/21/2014 | 11/24/2014 | 12/1/2014 | P | FAIL |
Phil Shearer
|
|
|
In violation 5 day notice posted
|
MIS-Aging Inspection | 11/14/2014 | 11/21/2014 | 11/24/2014 | P | CANC |
Phil Shearer
|
|
|
Cheke on CO
|
MIS-Aging Inspection | 11/7/2014 | 11/12/2014 | 11/14/2014 | A | DONE |
Phil Shearer
|
|
|
Follow up to see if tenant is geting CO. Talked with one off the tenants Anastasia she said that she will come and get a permit. I also taked with the property management company about contacting the other tenants.
|
MIS-Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | DONE |
Phil Shearer
|
|
|
Talked with oner he said that he would have the tenant go get CO.
|
MIS-Aging Inspection | 10/29/2014 | 11/7/2014 | 11/7/2014 | A | CANC |
Phil Shearer
|
|
|
Check back on CN posted on 10/29/14
|
BLD-Conference | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | FAIL |
Phil Shearer
|
|
|
4 tenant spaces, no CO's. phil Take Mike Jordan with you on this one. CN posted
|
BLD-Conference | 10/29/2014 | 10/29/2014 | 10/29/2014 | A | DONE |
Mike Jordan
|
|
|
|
Application received | | | 10/28/2014 | | |
|
|
|
|
Issue Misc Permit............ | | | 10/28/2014 | | DONE |
|
|
|
|