BLD-Conference | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | DONE |
Bob Archibald
|
|
|
Posted 289 and 186 Alto Via with Notice to Abate by demolition
|
BLD-Conference | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | DONE |
Bob Archibald
|
|
|
Property reposted "Unsafe to Occupy" and safety taped.
|
Case Summary | | | 7/14/2016 | | |
|
|
|
|
BLD-Conference | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PEND |
Bob Archibald
|
|
|
Reviewed structure with property owner, structure still moving and experiencing damage.Property owner has removed all contents of dwelling. Property reposted not to occupy and is secure against entry.
|
BLD-Conference | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | DONE |
Bob Archibald
|
|
|
Posted property Unsafe to Occupy".
|
BLD-Conference | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | DONE |
Bob Archibald
|
|
|
Residential structure and street still moving visible increase in structural integrity. Spoke with homeowner on removal of personal property.
|
BLD-Conference | 3/30/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Bob Archibald
|
|
|
Site visit. Structure still moving, testing and monitoring ongoing.
|
BLD-Conference | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PART |
Bob Archibald
|
|
|
Issued CN to owner in regard to performing structural/soil repairs and permit requirements. Also identified hazards as defined in 1997 Abatement Code.
|
BLD-Conference | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PART |
Bob Archibald
|
|
|
Conference call with property owner on posting of property questions/concerns.
|
BLD-Conference | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PART |
Bob Archibald
|
|
|
Posted property "Restricted Use": Allowed removal of personal property and no occupancy without engineering anaysis by structural and geotech.
Spoke with developer on current drilling and proposed future work/research.
Spoke with original builder on notification to owner and proposed future engineering/abatement.
Spoke with utility companies regarding disconnection; gas and electrical.
|
BLD-Conference | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PART |
Bob Archibald
|
|
|
Dave Hannah and I with the original builder and construction supervisor reviewed the interior of the single family dwelling and roadway in this subdivision. Excessive cracking, settlement was observed both inside and outside the structure. The developer and Strata engineering were performing soil testing/observation on the east side of the street. United Water has temporaryilly shut down two existing fire hydants on the street (Romeo was notified). Original builder will be hiring a professional engineer to evaluate the single family dwelling. Occupants of dwelling are currently residing in McCall for the week and dwelling is not occupied.
|
Application received | | | 3/22/2016 | | |
|
|
|
|
BLD-Conference | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PART |
Bob Archibald
|
|
|
Jason Taylor, Jason Blais and I reviewed roadways and exterior of an existing single family dwelling. heaving, settling and movement was observed on roadway and structure. Reported that special inspection was being performed to determine cause(s).
|