BLD-Conference | 5/19/2016 | 6/2/2016 | 6/2/2016 | A | DONE |
Jim Sly
|
|
|
Talked with Kenny ....Owner. Fire guys have been out and are aware of the problem that kenny installed a mezzanine....W/O permit ........in a sprinklered Bldg. Kenny said he will either permit.......or tear it out. He needs a week or so to compile costs of Eng. Arch. Plans. permits etc. to be able to make his decision. Check back. KENNY IS REMOVING MEZZANINE.
|
DOC - Permit Finaled | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Jim Sly
|
|
|
Kenny called and said he is removing Mezzanine.
|
BLD-Conference | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | DONE |
Jim Sly
|
|
|
per Ray Criner work being done without a permit Met with Kenny........Deciding wether to tear out Mezzanine or spend $ to make it legal. Fire dept. on the case as well. Re- shedueled........
|
Application received | | | 5/18/2016 | | |
|
|
|
|
Issue Misc Permit............ | | | 5/18/2016 | | DONE |
|
|
|
|