DOC - Permit Finaled | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Jim Little
|
|
|
work has been permitted under appropiate trade permits
|
PLM-Final | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PART |
Bill VanDegrift
|
|
|
plumbing permit required for 1) RP on both boiler makeup waters 2) cap all uused water in the production area 3) airgap di feed to tank 4) airgap water softener flush line mechanical permit required for 1) scrubbber and air handler system
|
Application received | | | 6/21/2016 | | |
|
|
|
|
Issue Misc Permit............ | | | 6/21/2016 | | DONE |
|
|
|
|