Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberMIS16-00397
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF
Site Address 985 N MAPLE GROVE RD
Project NameCOMPLAINT
Customer Number 
ePlanReviewNo
Description
Complaint of degraded stairways in building. Report of injury from falling tread.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/16/20206/17/20206/17/2020APASS
DetailsMike Jordan
Complaint of damaged exit sign in exterior breeze way. Issue CN.
DOC - Permit Finaled6/17/20206/17/20206/17/2020PPASS
DetailsMike Jordan
Exit sign is operational, is hanging from wires. This is a maintenance issue.
BLD-Conference5/16/20176/20/20176/20/2017ADONE
DetailsMike Jordan
End of 25 day notice Check status. Spoke with Steve Nail from Bright Ideas. I gave him until this friday June 20th. to have plans submitted.
BLD-Conference5/8/20175/16/20175/16/2017ADONE
DetailsMike Jordan
Issue 25 day notice if no action has been taken...A 25 day notice was issued. A follow up has been scheduled. Noted that Carl Madsen in plan review contacted me last week stating that brilliant services will be submitting the scope of work.
BLD-Conference5/5/20175/8/20175/8/2017ADONE
DetailsMike Jordan
Issue 5 day notice. 5day notice issued. Another inspection has been scheduled to issue a 25 day notice if no action has been taken.
BLD-Conference5/5/20175/5/20175/5/2017AFAIL
DetailsMike Jordan
No application has been made. A 5day notice will be issued Monday May 8th.
BLD-Conference2/3/20172/10/20172/10/2017ACANC
DetailsDave Hannah
BLD-Conference1/19/20171/20/20171/20/2017ADONE
DetailsMike Jordan
Spoke with Cable Amsden today on progress for stair repair. Cable noted that they have gotten a bid from Levitt engineering and are in the process of contacting Briggs engineering and Stapley engineering for bids as well. A follow up has been scheduled for Feb. 3rd. 2017.
BLD-Conference1/5/20171/19/20171/19/2017APEND
DetailsMike Jordan
Conferance to check on status. Called Cable Amsden to check on progress. Left message on his voice mail. No call back. Another conferance scheduled for 1-20-17.
BLD-Conference1/4/20171/5/20171/5/2017ADONE
DetailsMike Jordan
Repairs to damaged treds completed on stairways that were proviously closed. A bldg. conferance has been scheduled to check on job status on 1-19-17.
BLD-Conference1/3/20171/4/20171/4/2017ACANC
DetailsMike Jordan
rescheduled for 1-5.
BLD-Conference12/29/20161/3/20171/3/2017ADONE
DetailsMike Jordan
Check on repair status. Repairs in progress on stairs that have been closed only. Should be completed by end of day. Another building conferance has been scheduled for Jan. 4th. in the a.m. to inspect repairs. Also spoke with Darren with Greystar(maintenance contractor). They will be replacing 500 stair treads. I noted to Darren that they will need to hire a licensed structural engineer to inspect all existing egress stairs in complex. Engineer will note what needs to be replaced and repaired. A building permit will be required to be submitted showing allrequired repairs at there specific location.
BLD-Conference12/28/201612/29/201612/29/2016ADONE
DetailsMike Jordan
Investigate complaint of an exterior concrete stairway that has degraded over time and one tread fell apart causing a piece of concrete to hit someone below. Review all exterior stairways for structural integrity.. A correction notice was issued to obtain a building permit for tread replacements. All handrails and guards appear to be servicable condition. A confreance has been set up for Jan 3rd. to check on progress.
Application received  12/28/2016  
BLD-Conference1/20/20173/3/2017 A 
DetailsMike Jordan
Check on progres/status.