MIS-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/14/2017 | | DONE |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 5/23/2017 | 5/26/2017 | 5/26/2017 | P | DONE |
Jim Sly
|
|
|
Check back.......No work is going on at this time.....advised Contr......Need permit for window installation.
|
BLD-Conference | 5/22/2017 | 5/22/2017 | 5/23/2017 | P | DONE |
Jim Sly
|
|
|
333791 Contr. was advised by a plans examiner that only Electr. Plumb. and Mech. permits were required for Kichen and bath .....Floors, painting and cabinets.
|
PLM-Conference | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | FAIL |
Dan Ediger
|
|
|
Possible plumbing being done inside without permits. Notified the plumbers they could not work without a permit. Notified the plumbing contractor
|
ESC-Conference | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Andy J. Long
|
|
|
Trackout and loose dirt on Yorl Street and sidewalk has been swept up and cleaned. Will keep MIS open till BLD permits are turned in for new SFH(s). Lot has not yet been divided in multiple parcels.
|
BLD-Conference | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | DONE |
Jim Sly
|
|
|
No construction going on.
|
ESC-Conference | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PEND |
Andy J. Long
|
|
|
Called Hornet Construction. Prepping lot for future SFHs - tree removal crew left trackout and loose material on sidewalk and gutter of York Street.
Chris ###-#### stated he will clean it up this weekend and will be filing for applicable BLD and ESC permits for any further construction.
|
Application received | | | 5/12/2017 | | |
|
|
|
|
Issue Misc Permit............ | | | 5/12/2017 | | DONE |
|
|
|
|