MEC-Final | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brian Scoles
|
|
|
Rachael Phone #: ###-####
|
DOC - Permit Finaled | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brian Scoles
|
|
|
Rachael Phone #: ###-####
|
MEC-Conference | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | PART |
Brian Scoles
|
|
|
Rachel Phone #: ###-####- need to onstall 1 drip pan grease catcher on hood- need to install SS strips to cover where SS metal is butted together has a gap- move appliances 6" north and south to maintain clearances to hood- TEMP OCCUPANCY OK- left correction notice with new owner and they will call for inspection when they have items addressed
|
Issue Misc Permit............ | | | 4/6/2018 | | DONE |
|
|
|
|
Application received | | | 4/4/2018 | | |
|
|
|
|