ELE-Conference | 9/12/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Tom Saunders
|
|
|
check for permit pulled for heated tile floor in master bath...permit pulled and finaled
|
ELE-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tom Saunders
|
|
|
ok to final permit pulled for heated tile floor..ELE19-03468
|
ELE-Conference | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | DONE |
Tom Saunders
|
|
|
electrical work done without permit Phone #: ###-####...inspection scheduled for 9/18/19 to check for permit for heated tile floor install in master bath
|
Application received | | | 9/11/2019 | | |
|
|
|
|
Issue Misc Permit............ | | | 9/11/2019 | | DONE |
|
|
|
|