DOC - Permit Finaled | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Jack Reynolds
|
|
|
final ok
|
MEC-Conference | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | FAIL |
Jack Reynolds
|
|
|
Bruce Phone #: ###-#### - 15' of underground gas line doesn't have a permit and has not passed a pressure test - gas line needs to be exposed to check depth - section testing of a gas line needs seperated from live gas or a valve open ended tee valve installed - homeowner was going to get in touch with contractor who performed gas line
|
Application received | | | 10/1/2019 | | |
|
|
|
|
Issue Misc Permit............ | | | 10/1/2019 | | DONE |
|
|
|
|