BLD-Conference | 3/5/2020 | 3/12/2020 | 3/12/2020 | P | DONE |
Tell Riley
|
|
|
follow up....//permit was issued for siding and windows//still need permit for deck on front of home//
|
BLD-Conference | 2/25/2020 | 3/4/2020 | 3/5/2020 | A | DONE |
Tell Riley
|
|
|
follow up//talked with owner last week, advised him to get permit//will check back next week//
|
BLD-Conference | 2/25/2020 | 2/25/2020 | 2/25/2020 | A | DONE |
Tell Riley
|
|
|
working on window and siding//new front porch beinng installed//left correction notice with worker onsite//will check back in 5 days//
|
Application received | | | 2/25/2020 | | |
|
|
|
|
Issue Sewer Permit | | | 2/25/2020 | | DONE |
|
|
|
|