BLD-Conference | 3/11/2020 | 3/25/2020 | 3/27/2020 | A | DONE |
Tell Riley
|
|
|
follow up.....//no one working onsite,doesnt look like any work has been going on//will check back//
|
BLD-Conference | 3/4/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Tell Riley
|
|
|
follow up....//no workers onsite//dont see any permits yet....check back//
|
MEC-Conference | 2/26/2020 | 3/11/2020 | 3/11/2020 | A | NH |
Brian Scoles
|
|
|
check on permit status- no one on job site- correction still posted on front door-
|
BLD-Conference | 2/26/2020 | 3/4/2020 | 3/4/2020 | P | DONE |
Tell Riley
|
|
|
follow up on no permits.....//trades inspectors have made contact//no work going one today//check back//
|
PLM-Conference | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | DONE |
Matt Wrobel
|
|
|
left notice
|
MEC-Conference | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | DONE |
Brian Scoles
|
|
|
talked with people onsite- they stated permits will be issued- any mechanical work being done requires a permit I.E. new furnace a/c ducting exhaust fans etc and inspected- left notice front door-
|
ELE-Conference | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Tom Saunders
|
|
|
permit was pulled for temp power by electrical contractor...stated will pull permit once interior is addressed or rewired
|
BLD-Conference | 2/26/2020 | 2/26/2020 | 2/26/2020 | A | DONE |
Tell Riley
|
|
|
correction notice posted//appears to be exterior siding and windows--new/ working on//appears to be a gut to the studs remodel// do not see any permits//check back 5 days//
|
Application received | | | 2/26/2020 | | |
|
|
|
|
Issue Misc Permit............ | | | 2/26/2020 | | DONE |
|
|
|
|