BLD-Conference | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | CANC |
Tell Riley
|
|
|
follow up on 5 day notice of violation
|
BLD-Conference | 6/24/2020 | 7/1/2020 | 7/1/2020 | A | CANC |
Tell Riley
|
|
|
follow up on 5 day notice of violation//moved to PM//
|
BLD-Conference | 6/17/2020 | 6/24/2020 | 6/24/2020 | A | DONE |
Tell Riley
|
|
|
notice of violation was issued as no permit has been issued//5 day notice//check back 5 days//photos taken at time of posting//
|
BLD-Conference | 6/3/2020 | 6/10/2020 | 6/17/2020 | A | DONE |
Tell Riley
|
|
|
follow 5 days//issue notice of violaiton of no permit obtained for roof////checked on 6/10/20, CN was not removed from window//on 6/17/20 CN was removed//will check back in 5 days//
|
BLD-Conference | 5/20/2020 | 6/3/2020 | 6/3/2020 | P | CANC |
Tell Riley
|
|
|
10 day follow up//3rd correction notice posted//no permit has bee obtained for roof//someone was onsite but didnt answer door when i knocked//notice to obtain permit in 5 days or notice of violation will be issed//
|
BLD-Conference | 5/13/2020 | 5/20/2020 | 5/20/2020 | A | DONE |
Tell Riley
|
|
|
follow up ///2nd CN posted on front window this time//house appears to be empty, lock box by front door//10 day follow up scheduled//
|
BLD-Conference | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | DONE |
Tell Riley
|
|
|
no one home CN left on door mat at front door//roofing being done without permits//follow up in 5 days//
|
Application received | | | 5/13/2020 | | |
|
|
|
|
Issue Misc Permit............ | | | 5/13/2020 | | DONE |
|
|
|
|