BLD-Conference | 6/2/2020 | 6/16/2020 | 6/16/2020 | A | DONE |
Tell Riley
|
|
|
follow up on permits
|
DOC - Permit Finaled | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Tell Riley
|
|
|
roof permit was issued and finaled//other permits were for minor hvac changes and a new water heater//
|
BLD-Conference | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | DONE |
Tell Riley
|
|
|
CN posted to obtain permits if required for remodel and/or re-roof//follow up scheduled in 10 days//
|
BLD-Conference | 6/1/2020 | 6/1/2020 | 6/2/2020 | P | CANC |
Tell Riley
|
|
|
|
Application received | | | 6/1/2020 | | |
|
|
|
|
Issue Misc Permit............ | | | 6/1/2020 | | DONE |
|
|
|
|