BLD-Conference | 6/16/2020 | 6/30/2020 | 6/30/2020 | A | DONE |
Tell Riley
|
|
|
follow up
|
DOC - Permit Finaled | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Tell Riley
|
|
|
permit was issued and finaled for roof
|
BLD-Conference | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | DONE |
Tell Riley
|
|
|
CN issued for re-roof//Brian mechanical inspecor witnessed roof being installed// follow up in 10 days//
|
Application received | | | 6/15/2020 | | |
|
|
|
|
Issue Misc Permit............ | | | 6/15/2020 | | DONE |
|
|
|
|