BLD-Conference | 8/4/2020 | 8/11/2020 | 8/11/2020 | A | DONE |
Tell Riley
|
|
|
follow up on permits//
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tell Riley
|
|
|
roof permit was issued
|
BLD-Conference | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | DONE |
Tell Riley
|
|
|
possible roof work without permit//correction notice left with worker onsite, spoke to supervisor on phone, should be getting a permit pulled for the work//follow up 5 days/
|
Application received | | | 8/3/2020 | | |
|
|
|
|
Issue Misc Permit............ | | | 8/3/2020 | | DONE |
|
|
|
|