INSP-Sprinkler Rough-in | 12/5/2014 | 12/5/2014 | 12/8/2014 | P | PASS |
Craig D. Hanson
|
|
|
System tested and passed
|
INSP-Sprinkler Rough-in | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PART |
Troy Cobbley
|
|
|
Rough-in for the scope of work submitted is passed. The problem lies with existing upright coverage being blocked by structural sheating with-in the trusses them selves. All piping can be covered except in the location where this problem occurs.
|
Plan assigned to (Craig) | 10/31/2014 | | 10/31/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/31/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Courier | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 10/28/2014 | | |
|
|
|
|
Plan assigned to (Tim) | 10/28/2014 | | | | |
Tim Frost
|
|
|
|