INSP-Final | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Katie Marron
|
|
|
Systems test completed satisfactory. Scope of work complete. Permit finaled. System to remain active.
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Katie Marron
|
|
|
Hydrostatic test completed satisfactory 12/7/15 (reading at 2:10pm 212 psi, again at 4:14pm 212psi) Rough in inspection completed satisfactory, ok to cover. **To be verified at final** two dry pendants in cooler, 4 dry sidewalls at entrances and one regular sidewall in electrical room. Stubs were present at roughin . Also to be completed riser accessories (FDC, main drain etc)
|
INSP-Sprinkler Rough-in | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | DONE |
Katie Marron
|
|
|
Early Start Inspection on 11/3 for riser stub in. Riser ok to pour floor slab, discussed pouring around a ring for seismic protection. Verified appropriate depth on stub outside of building footing. End of pipe submerged in dirt, unsure if capped, ensure flush is done well at later date.
Initially posted to NAF15-00025 which is alarm permit. Added here to ensure documented appropriately.
|
INSP-Sprinkler Rough-in | 11/13/2015 | 11/16/2015 | 11/13/2015 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 9068792 >> Inspection requested via mobile web by Jessica/Tribal Fire Inspection cancelled via mobile web on Friday, November 13, 2015.
|
INSP-Supply line flush | 11/3/2015 | 11/3/2015 | 11/3/2015 | A | DONE |
Katie Marron
|
|
|
Early Start Inspection for riser stub in. Riser ok to pour floor slab, discussed pouring around a ring for seismic protection. Verified appropriate depth on stub outside of building footing. End of pipe submerged in dirt, unsure if capped, ensure flush is done well at later date.
|
Miscellaneous action | | | 10/26/2015 | | DONE |
|
|
|
Early Start document needs to be transfered to the actual sprinkler permit when it is applied for by Tribal Fire. This permit is for a sprinkler monitoring fire alarm system. The sprinkler application has not been received yet.
|
1st review completed | | | 10/26/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 10/26/2015 | | 10/26/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/26/2015 | | DONE |
|
|
|
Two copies of approved plans taken to Candy Nichols at the front dest for processing.
|
Issue and Courier | | | 10/26/2015 | | DONE |
|
|
|
|
Early Start | | | 10/21/2015 | | PASS |
|
|
|
See documents. Approved
|
Application received | | | 10/20/2015 | | |
|
|
|
|
Plan assigned to (Lee) | 10/20/2015 | | 10/20/2015 | | DONE |
Lee G Meredith
|
|
|
|