INSP-Final | 1/12/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Katie Marron
|
|
|
Systems test completed satisfactory. Tested panel smoke and pull, sprinkler monitioring, and HVAC detectors. Scope of work complete, permit finaled.
|
Telephone call | | | 12/22/2015 | | DONE |
|
|
|
Jonathan Ahten called to say the owner has elected to go with a wireless communicator instead of phone lines. He wanted to know if resubmittals for a plan modification was to be done through NACFR or with Boise City. I told him to call NACFR directly for their requirements. He called NACFR and they defered to Boise City. I told Jonathan to email a cut sheet that I can insert into the project and to provide as built drawings to indicate the change.
|
Issue and Courier | | | 11/2/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/30/2015 | | PASS |
|
|
|
|
Alarm Plan Check | 10/30/2015 | | 10/30/2015 | | PASS |
Lee G Meredith
|
|
|
|
Application received | | | 10/26/2015 | | |
|
|
|
|
Plan assigned to (Lee) | 10/27/2015 | | | | |
Lee G Meredith
|
|
|
|