INSP-Final | 12/13/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit finaled.
|
INSP-Supply line flush | 8/30/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Katie Marron
|
|
|
Underground flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Katie Marron
|
|
|
UDG Hydrostatic test completed satisfactory.
Flush is still remaining.
|
INSP-Sprinkler Rough-in | 5/5/2016 | 5/6/2016 | 5/6/2016 | P | PASS |
Katie Marron
|
|
|
Underground roughin completed satisfactory. Ok to cover.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PART |
Troy Cobbley
|
|
|
Underground supply line is ok to cover from tap to the sidewalk.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/5/2016 | A | PART |
Troy Cobbley
|
|
|
Underground ok to cover up to sidewalk
|
Sprinkler Plan Check | 11/24/2015 | | 11/24/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2015 | | DONE |
|
|
|
|
1st review completed | | | 11/24/2015 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 11/24/2015 | | DONE |
|
|
|
permits had the plan review done and passed on 11/24/15-but were not changed to iss.
|
Issue and Courier | | | 11/24/2015 | | DONE |
|
|
|
permits had the plan review done and passed on 11/24/15-but were not changed to iss.
|
Application received | | | 11/20/2015 | | |
|
|
|
|
Plan assigned to (Tim) | 11/20/2015 | | | | |
Tim Frost
|
|
|
|