INSP-Final | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Scott Arellano
|
|
|
Flush Completed
|
INSP-Supply line flush | 4/13/2017 | 4/14/2017 | 4/13/2017 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PASS |
Katie Marron
|
|
|
Underground hydro completed satisfactory
|
INSP-Sprinkler Rough-in | 8/11/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Katie Marron
|
|
|
Underground OK to cover from sidewalk to riser. Previous note on 6/22/16 was input in error. Bldg D UDG still needs hydro and flush
|
INSP-Sprinkler Rough-in | 6/21/2016 | 6/22/2016 | 6/22/2016 | P | PASS |
Katie Marron
|
|
|
Remainder of UDG OK to cover. Observed thrust blocks being poured.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PART |
Troy Cobbley
|
|
|
Underground supply line is ok to cover from tap to the sidewalk.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/5/2016 | A | PART |
Troy Cobbley
|
|
|
Underground ok to cover up to sidewalk
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2015 | | DONE |
|
|
|
|
1st review completed | | | 11/24/2015 | | PASS |
|
|
|
|
Sprinkler Plan Check | 11/24/2015 | | 11/24/2015 | | PASS |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/24/2015 | | DONE |
|
|
|
permits had the plan review done and passed on 11/24/15-but were not changed to iss.
|
Issue and Courier | | | 11/24/2015 | | DONE |
|
|
|
permits had the plan review done and passed on 11/24/15-but were not changed to iss.
|
Application received | | | 11/20/2015 | | |
|
|
|
|
Plan assigned to (Tim) | 11/20/2015 | | | | |
Tim Frost
|
|
|
|