INSP-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Katie Marron
|
|
|
System test completed satisfactory. Verified tenting, satsifactory at time of inspection. Scope of work complete. Permit Finaled.
|
Web-Comment on Case | | | 7/7/2016 | | DONE |
|
|
|
Note on previous rough-in: Heat Tracing on sections of pipe crossing the open halls on each floor still to be installed/inspected.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Katie Marron
|
|
|
Hydro for all three floors/risers completed satisfactory. Rough in all three floors completed. Hangars missing on one stretch of pipe on first floor, first unit on right. Tenting inspection needed for 3rd floor.
|
1st review completed | | | 2/10/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/10/2016 | | 2/10/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 2/10/2016 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/5/2016 | | | | |
Tim Frost
|
|
|
|