INSP-Final | 12/13/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Katie Marron
|
|
|
Systems test completed satisfactory. Scope of work complete. Permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PASS |
Katie Marron
|
|
|
Hydrostatic test for all flrs and remote fdc completed satisfactory. FDC roughin complete. Heat trace on third floor installed.
Tenting inspection on third floor: at the time of inspection tenting was satisfactory.
|
INSP-Sprinkler Rough-in | 9/1/2016 | 9/1/2016 | 9/1/2016 | A | DONE |
Katie Marron
|
|
|
Completed 8/31/16. Rough-in for third floor complete. All side wall sprinklers on all floors complete, mains from riser up are completed.
Still to be completed: -tenting third floor -heat trace on all floors/breezeways -remote FDC
|
INSP-Sprinkler Rough-in | 8/16/2016 | 8/17/2016 | 8/17/2016 | P | DONE |
Katie Marron
|
|
|
Rough-in 1st & 2nd floor completed satisfactory. Two missing hangars fixed on the spot. **Sidewalls and riser not installed, these areas must remain uncovered for inspection.**
|
INSP-Sprinkler Rough-in/Hydro | 8/11/2016 | 8/16/2016 | 8/16/2016 | A | CANC |
Katie Marron
|
|
|
Inspection called in under building system permit. Was completed and recorded on correct UDG permit.
|
1st review completed | | | 2/10/2016 | | PASS |
|
|
|
|
Sprinkler Plan Check | 2/10/2016 | | 2/10/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 2/10/2016 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/5/2016 | | | | |
Tim Frost
|
|
|
|