INSP-Final | 5/15/2017 | 5/17/2017 | 5/17/2017 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Scott Arellano
|
|
|
Hydro test for systems 1, 2, & 3 building "D" Pass
|
INSP-Sprinkler Rough-in | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PASS |
Katie Marron
|
|
|
Rough in and tenting inspection for remaining sections of building. Verified heat tape at all six breezeways. Verifed vertical FDC pipe with ball drip. At time of inspection tenting OK.
All units ok to cover besides two spaces with missing drops; one at the second flr and one at the third flr (see plans)
|
INSP-Sprinkler Rough-in | 2/6/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Troy Cobbley
|
|
|
The FDC piping in the first floor apartment is complete except for the piece down the wall with the ball drip. Piping in the apartment is ok for cover. Vertical piece can be verified at the next inspection.
|
INSP-Sprinkler Rough-in | 2/2/2017 | 2/6/2017 | 2/6/2017 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the seven apartments, 1st/2nd floors, where rough-in is passed and piping can be covered. One apartment as noted on the 1st floor can not be covered since the piping to the FDC has not been installed. Piping in the breeze way can not be covered until the heat tape is verified.
|
1st review completed | | | 2/10/2016 | | PASS |
|
|
|
|
Sprinkler Plan Check | 2/10/2016 | | 2/10/2016 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 2/10/2016 | | DONE |
|
|
|
|
Application received | | | 2/5/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 2/5/2016 | | | | |
Tim Frost
|
|
|
|