INSP-Final | 3/23/2017 | 3/28/2017 | 3/28/2017 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit Finaled.
|
INSP-Sprinkler Rough-in | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | DONE |
Katie Marron
|
|
|
At time of inspection tenting and heat tape completed satisfactory.
Verified remote FDC roughin completed satisfactory.
|
INSP-Sprinkler Rough-in | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Troy Cobbley
|
|
|
Dry sidewall heads inspected and are ok to cover. Contractor will need to maintain required distance from surface above.
|
INSP-Sprinkler Rough-in | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PART |
Katie Marron
|
|
|
Rough-in 1st and 2nd floors complete with the exception of the dry sidewalls. Sprinkler heads missing in a few utility rooms (drops were in place).
|
1st review completed | | | 2/10/2016 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/10/2016 | | 2/10/2016 | | PASS |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 2/10/2016 | | DONE |
|
|
|
|
Application received | | | 2/5/2016 | | |
|
|
|
|
Plan assigned to (Tim) | 2/5/2016 | | | | |
Tim Frost
|
|
|
|